•  

    (+91) 85113 32200

  •  

    info@shyamgroups.co.in

Current Status of Dholera

Design & Construction of ABCD Building

The Contractor scope includes Design, Procurement, Construction, Installation, Testing and Commissioning of ABCD Building in Dholera.

M/s Cube Construction & Engineering Ltd

72.31

Completed

Raw Water Transmission Main (RWTM – 10 MLD)

- The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months and 5 year O&M of 10 MLD Raw water pumping station and Raw Water Transmission Main from Pipli Pumping Station (Pariyej Reservoir) to Water Treatment Plant at TP1 in Dholera SIR.

M/s D. R. Agarwal Infra Pvt Ltd

29.67

Completed

Adhiya River Bunding Phase-1

Phase-I works of Flood Protection of Adhiya River between SH-06 and Khun village

M/s Jugalkishore Ramkishan Agrawal Pvt Ltd

11.87

Completed

Interior Works of BEC Building

Interior Works of Business and Exhibition Centre (BEC) building in ABCD Complex in DSIR

New Concept

19.44

Completed

Experience Zone at ABCD Building

The project vision is to create a state-of-the-art “Experience Zone” with Physical Model, Projection Mapping and display of the content on the digital wall. This Experience zone is located on the Ground floor of the BEC (Business & Experience Centre) Building at DSIR, Dholera, Gujarat. The model will be surrounded by the vision walls and other Dholera specific branding contents.

Tagbin

4.84

Completed

Design & Construction of Roads & Services

The scope of work includes design and construction of the project roads and utilities/services like road network; Potable water supply network; Recycled water supply network; Sewage network; Industrial Effluent collection network; Storm water drainage network; RCC ducts for ICT network, Power supply network and crossings at junctions; Bridges and Outfall structures; Plot level Roads and Visual Branding elements etc.

M/s Larsen & Toubro Ltd

1801.07

Ongoing

Canal Front Development Zone - 2

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 02) in Dholera Special Investment Region, Dholera

M/s P.R.Patel & Company

26.43

Ongoing

Canal Front Development Zone - 3

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 03) in Dholera Special Investment Region, Dholera

M/s P.R.Patel & Company

14.99

Ongoing

Service Area Buildings (with Porta Cabins)

Design, Procurement and Construction of 17 nos. of Service Area (With Porta Cabin), Operation and Maintenance of the project in conformity with the specifications & standards.

M/s Bridge & Roof Co. India Ltd

32.82

Ongoing

Common Effluent Treatment Plant (CETP – 20 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months and 5 year O&M of 14 Intermediate Effluent Pumping stations , 1 Terminal Pumping station , 20 MLD Common Effluent Treatment Plant , RO reject disposal pipeline (12 MLD) from the RO reject tank to the outfall at Sukhbhadar creek, Master Balancing Reservoir- Recycled water (20 ML) & Pumping station for Recycled water (80 MLD)

M/s Larsen & Toubro Ltd

156.86

Ongoing

Sewage Treatment Plant (STP – 10 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months & 5 year O&M of 6 Intermediate Sewage Pumping Stations , 1 Terminal Pumping station , 10 MLD Sewage Treatment Plant , 7.5 ML Master Balancing Reservoir and 70 MLD Pumping Station.

M/s Larsen & Toubro Ltd

53.13

Ongoing

Balance Works of WTP (WTP – 50 MLD)

The Contractor scope includes review of designs already done and updation (if required), carry out all balance designs, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 2 months, 5 year O&M of 50 MLD Water Treatment Plant , Clear Water Reservoir (16.7 ML) , Clear Water Pumping Station (150 MLD), Potable Water Transmission Main (121.5 MLD) ,Master Balancing Reservoir (10 ML) & Potable water Pumping station (25.5 MLD).

M/s. MS Khurana Engineering Ltd

87.97

Ongoing

Earth filling in Selected Plots of Activation Area

Filling of Soil in Plot-A (70 Ha) and Plot-B (92 Ha) with average soil filling depth of 2.0m. The Scope of work pertain to clearing and grubbing of the project site of Plot A & B, Removal of unsuitable material from the project site and soil filling in the project site. Scope of work also includes temporary works for approach roads to project site. All work shall be carried out in accordance with the specification, drawings, BoQ and as per the direction of Employer’s representative.

M/s. MS Khurana Engineering Ltd

87.97

Ongoing

ICT MSI Project

Design, Supply, Install, Test, Integrate, Commissioning, Operation & Maintenance of ICT Components in Cluster A1 of Activation Area at Dholera.

M/s D. R. Agarwal Infra Pvt Ltd

68.99

Ongoing

ICT MSI Project

Design, Supply, Install, Test, Integrate, Commissioning, Operation & Maintenance of ICT Components in Cluster A1 of Activation Area at Dholera.

M/s D. R. Agarwal Infra Pvt Ltd

68.99

Ongoing

Interior Works of SPV Building

Interior Works of Special Purpose Vehicle (SPV) building at ABCD Complex in DSIR

New Concept

15.58

Ongoing

Adhiya River Bunding Phase-2

Phase-II Flood Protection works of Adhiya River between SH20 and SH06 are to be constructed under this project.

M/s Kalthia Engineering & Construction Ltd

21.25

Ongoing